Click to Home
HomeEmail PagePrint PageRSS Feeds

Go To Search
Storm Water Pollution Prevention Plan (SWPPP)
Overview
State and Federal law requires a Storm Water Pollution Plan for all developments exceeding one acre. West Valley City requires the Storm Water Pollution Prevention plan be formatted on standard 24” x 36” sheets so that it can be integrated into the construction plan set. Developments of less than one acre will still be required to take appropriate measures to prevent sediment from entering the storm drain system and to prevent the tracking of mud and debris onto city streets.

The SWPPP should provide information regarding construction period Best Management Practices (BMPs), location of BMPs, details of specific BMPs and notes specific to the project. Avoid “boiler plate” notes that are not relevant to the project.

A guideline for developing a SWPPP is available through the Utah Department of Environmental Quality, Division of Water Quality:
http://www.waterquality.utah.gov/UPDES/stormwatercon.htm

A notice of intent (NOI) must be filed through the Utah State Division of Water Quality and can be obtained online at https://secure.utah.gov/stormwater/main.html.

Upon completion of the project a notice of termination (NOT) must be obtained.


FacebookTwitterWVCTV
City Hall • 3600 South Constitution Blvd.
West Valley City, Utah 84119 • Ph: (801) 966-3600