Permit costs vary with the size of the addition or remodel. The larger the area affected, the higher the cost of the permit.
- Basement Entry: 50 + 12.50 Review + 20 P/Z + .50 + 3.12 = $86.12
- Basement remodel (based on square footage): $53 minimum – see example chart
- Board of Appeals Hearing: $200
- Cell Towers: $300 + 3 + 15 = $318 + P/Z
- Cell Towers (co-location – new antennas/cabinets on existing building): $100 + 20 P/Z + 1 + 5 = $126
- Deck (covered and uncovered): $50 + 20 P/Z + .50 + 2.50 = $73
- Demolition (requires owner’s signature and approvals from Air Quality, Health Dept, and Questar – see policy): $53 per building
- Electrical
- Electrical – upgrade less than 200 amp service: $53
- Electrical – upgrade 200 amps to 400 amps: $75 + .75 + 3.75 = $79.50
- Electrical – upgrade over 400 amps or over 600 volts: $90 + .90 + 4.50 = $95.40
- Exhaust Hoods (hood and electrical): $53 + $240 Fire Fees = $293
- Exhaust Hoods (hood, electrical, and new gas line): $106 + $240 Fire Fees = $346
- Fire Repair (requires pre-inspection of $53; priced per valuation)
- Garage – footings/foundations only: $90 + .90 + 4.50 + 20 P/Z = $115.40
- Generator: $100 + 1 + 5 = $106 + P/Z and Fire Dept Fees
- Handicap Ramps (residential): $53 + 20 P/Z = $73
- Mechanical
- Mechanical – Furnace only (0–150,000 BTUs): $53
- Mechanical – Furnace (0–150,000 BTUs) and AC (1–8 tons): $53 + .53 + 2.65 = $56.18
- Commercial HVAC or split systems:
-
- Furnace (100,000–500,000 BTUs) and/or AC (9–1 tons): $65 + .65 + 3.25 = $68.90
- Furnace (500,001–1,000,000 BTUs) and/or AC (42–83 tons): $79 + .79 + 3.95 = $83.74
- Furnace (1,000,000–1,750,000 BTUs): $97 + .97 + 4.85 = $102.82
- Furnace (over 1,750,000 BTUs): $158 + 1.58 + 7.90 = $167.48
-
- Mobile Home (not in mobile home park): $200 + 20 P/Z + 2 + 10 = $232 + cost of garage/carport or basement + impact fees
- Mobile Home replacements (in mobile home park): $75 + 20 P/Z + .75 + 3.75 = $99.50
- Move-on Houses (requires pre-inspection): $200 + 20 P/Z + 2 + 10 = $232 + garage/carport or basement + impact fees
- Permit renewals: $50 per inspection plus state and tech fees
- Racking Systems: $200 + 2 + 10 = $212 + Fire Review Fees
- Record Changes after permit issued (address, lot changes, etc.): $53
- Re-inspection Fee: $53
- Roof – Commercial re-roof: $500 + 5 + 25 = $530
- Roof re-shingle: $53
- Roof conversion: $105 + 1.05 + 5.25 = $111.30
- Satellite Dish: $20 + .20 + 1.00 = $21.20 + P/Z fee if required
- Sign fee based on valuation: minimum fee $150 + 25 + state, tech, and P/Z fees
- Solar panels on top of existing building: $100 + 1.00 + 5.00 = $106 + P/Z if site review required. Only a licensed electrical contractor with an S200 license can pull a permit.
- Stucco/Lath: $100 + 1 + 5 = $106
- Swimming Pool: $175 + 20 P/Z + 1.75 + 8.75 = $205.50
- Wind Turbines (electrical): $200 + 2 + 10 = $232
- Wood Stoves: $20 + .20 + 1 = $21.20